EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
DR_DAVE'S_RV-10
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (111)
Research
- (1)
-
Logo
Tools
Workshop
- (2)
-
Practice Kit
-
Workshop Area
Tail Feathers
- (83)
-
Replaced Finished...
-
Tail Tie Down
-
IA progress inspection
-
Counterweight
-
Elevator Counterweight
-
Riveting elevator...
-
Riveting Elevator...
-
Riveting Hinge...
-
Riveting Hinge Halves
-
Elevator Trailing Edge
-
SB-00043
-
SB-00043 more
-
SB-00043
-
Trim Tabs
-
Riveting skins
-
re-prime
-
Trim tab trailing edges
-
Begin prep for SB-00043
-
Tip Ribs
-
Tip Ribs LCP...
-
Elevator Trim Tabs
-
Elevator Assembly -...
-
Back Riveting Ribs...
-
Elevator Assembly
-
Elevator and Trim...
-
Prep and Alodine...
-
Etch Prime Elevator...
-
Trim Tab Horns
-
Elevator Spars -...
-
HS Finished!!
-
Bottom Side HS
-
HS final steps
-
Bottom Skins
-
Bottom Skins
-
H Spar Rivering...
-
Bottom and Top Skins
-
Nose Ribs to Skin
-
Elevator Parts...
-
Elevator Gusset
-
VS Nose Ribs and...
-
Tip Ribs - Long Day
-
Elevator Tip Ribs,...
-
Elevator Ribs
-
Elevator Ribs -...
-
Assembling Front Spar
-
Elevator
-
Front Spar and Nose...
-
Riveting Inspar Ribs...
-
Epoxy Priming HS Parts
-
Countersinking...
-
New HS-1014 and...
-
HS Alodine Parts
-
HS Stringer Web and...
-
Dimpling HS Parts
-
HS Stringers,...
-
More Riveting Progress
-
Riveting HS Spars
-
Alodine and Prime HS...
-
Counterinking HS Spars
-
HS Rib Mods and...
-
Milling of HS Spars...
-
Rudder Counterweight...
-
Rudder Leading Edge
-
Rudder Trailing Edge
-
Rudder Assembly
-
Rudder Innards Assembly
-
Assembly of Vertical...
-
Still on the road
-
Back to Work
-
Elevator Spar
-
Rudder
-
Rudder
-
Finishing Up...
-
Vertical Stabilizer...
-
Vertical Stabilizer
-
Rudder Stiffeners
-
Rudder Stiffeners
-
VS and Rudder
-
Deburring Rudder Parts
-
Short Night
-
Vertical Stabilizer
-
Riveting elevator...
Empennage
- (6)
-
On the Road again
-
Disassemble of tailcone
-
Upper Rear Skin...
-
Back from a three...
-
More Empennage build
-
Empennage Build
Fuselage
Firewall
Wings
- (2)
-
LCP replacement Parts
-
Wing Kit Inventory
Controls
Avionics
Lighting
Instrument Panel
Landing Gear
Engine
Propeller
Fuel System
Interior Finish
Paint / Decals
- (2)
-
Epoxy Prime Alodined...
-
Paint Booth Completed
Inspection
Misc.
- (14)
-
Been on the road
-
Van's Laser Drill...
-
Van's Laser Drill...
-
Oshkosh 2023
-
Duramax LBZ all back...
-
Still rebuilding LBZ
-
Putting Engine back...
-
Taking a break for a...
-
In Europe for a...
-
Back from OSH
-
Conversion Coating
-
Conversion Coating -...
-
Alodine Work Area
-
Inventory
Mis-Steakz
- (1)
-
Mistakes in process...
Builder Name:
DAVE LEHMAN
-
Project:
Vans - RV-10
-
VIEW REPORTS
Total Hours:
452.1
Total Flight Time:
Start/Last Date:
Oct 01, 2020 - Feb 03, 2026
Friendly URL:
https://eaabuilderslog.org?s=DR_DAVE'S_RV-10
Home or Last Project Picture
Apr 24, 2022
Counterinking HS Spars
- (8 hours)
Category: Tail Feathers
Decided to jump ahead and perform Step 8, Pg 8-8 to countersink both HS spars, doublers and ribs. My process will have these items Alodined and epoxy primed, thus wanted to do machine work prior.
Forward Spar Countersink A.jpeg
Forward Spar Countersink B.jpeg
Forward Spar Countersink C.jpeg
Forward Spar Countersink F.jpeg
Forward Spar Countersink E.jpeg
Forward Spar Countersink D.jpeg
Forward Spar Countersink G.jpeg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.